Oil & Gas | Type of Industry |
Southwestern Province of Khuzestan | Location: |
Study of drilling, wellhead equipment, pipelines, cluster construction, operation units and oil transfer to the west Karoon refinery | Project Scope |
Petroleum Engineering and Development Company | Client: |
Persia Oil and Gas Industry Development Company (POGIDC) | Contractor: |
Construction and Operation | Type of project: |
56 Square Kilometers | Area of the Project Site |
Supply of HSE specialists manpower (67 persons) | Services: |
HSE monitoring and inspection of all firefighting and medical services covering surface and subsurface activities and facilities | |
Establishment of Integrated HSE-MS Management System | |
Supply of Firefighting, Emergency and Medical HSE equipment and hardware | |
Establishment of HSE training system | |
Development of HSE documents (manuals, plans, instructions, forms, procedures and checklists) | |
36 Months | Project Duration |
Nil | Number of LTI (in persons) during ngi’s presence in the project |
پاسخ به دیدگاه
برای نوشتن دیدگاه باید وارد بشوید.